Articles & Issues
- Language
- English
- Conflict of Interest
- In relation to this article, we declare that there is no conflict of interest.
- This is an Open-Access article distributed under the terms of the Creative Commons Attribution Non-Commercial License (http://creativecommons.org/licenses/bync/3.0) which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited.
Copyright © KIChE. All rights reserved.
All issues
Removal of Nitrogen and Phosphorus Using a New Biofilm Process -INRS (Innovative Nutrient Removal System)
Department of Environmental Engineering, Pusan Nation University, Pusan, Korea
Korean Journal of Chemical Engineering, May 1999, 16(3), 303-307(5), 10.1007/BF02707117
Download PDF
Abstract
Adopting various process configurations may perform biological nutrient removal (BNR) from sewage. To get a compact BNR process, biofilm reactors were chosen far nitrification and denitrification. Enhanced biological nitrogen and phosphorus removal in a new fixed biofilm reactor was investigated in operation strategies with two reaction phases : anaerobic/anoxic/aerobic process with post-anoxic/aerobic biofilm process (Run 2A) and Run 2A with exogenous carbon sources for denitrifying and removing Phosphorus (Run 2B). The influent used was "J" WWTP influent that consisted of wastewater from nearby a factory district area, leachate, and sewage. Therefore, the influent contained a great deal of refractory organic compound. The mean concentrations of COD, NH4+-N and T-P in the influent were about 297.0 mg/L, 64.92 mg/L and 2.63 mg/L, respectively. The C : N : P ratio of influent was 113 : 25 : 1 and it was not suitable for growth of microorganism compared with 100 : 5 : 1 of proper growth C : N : P ratio. But at a total HRT of the system of 16 hours in Run 2, the system worked successfully obtaining removal of COD, T-N and T-P of the case of Run 2A, 80.1%, 74.9%, and 50.8%, respectively, and Run 2B(c) with exogenous carbon source (Na-acetate) obtained 86.2 % T-N removal efficiency. The results of this research showed that an innovative nutrient removal system (INRS) process packed with SAC media could be applicable for treatment of nutrients from municipal wastewater.
Keywords
References
Carley BN, Mavinic DS, Res. J. Wat. Pollut. Control Fed., 63, 51 (1991)
Ekama GA, Marais VR, Siebrits IP, "Biological Excess Phosphorus Removal," In Theory, Design and Operation of Nutrient Removal Activated Sludge Processes, Chapter 7, Water Research Commission, Pretoria, South Africa (1984)
Gerber A, Mostert ES, Winter CT, de Villiers RH, Water Sci. Technol., 19, 183 (1987)
Manoharan R, Liptak S, Parkinson P, Mavinic D, Randall CW, Environ. Technol., 10, 701 (1989)
Park TJ, Lee KH, Kim DS, Kim CW, J. KSEE, 17(5), 471 (1995)
Park TJ, Lee KH, Kim DS, Kim CW, Water Sci. Technol., 34(10), 9 (1996)
Lee KH, Lee JH, Park TJ, Korean J. Chem. Eng., 15(1), 9 (1998)
Nam HU, Lee JH, Kim YO, kim YG, Park TJ, Korean J. Chem. Eng., 15(4), 429 (1998)
Park WK, Jung KY, Shin EB, J. KSWQ, 12(4), 409 (1996)
Ekama GA, Marais VR, Siebrits IP, "Biological Excess Phosphorus Removal," In Theory, Design and Operation of Nutrient Removal Activated Sludge Processes, Chapter 7, Water Research Commission, Pretoria, South Africa (1984)
Gerber A, Mostert ES, Winter CT, de Villiers RH, Water Sci. Technol., 19, 183 (1987)
Manoharan R, Liptak S, Parkinson P, Mavinic D, Randall CW, Environ. Technol., 10, 701 (1989)
Park TJ, Lee KH, Kim DS, Kim CW, J. KSEE, 17(5), 471 (1995)
Park TJ, Lee KH, Kim DS, Kim CW, Water Sci. Technol., 34(10), 9 (1996)
Lee KH, Lee JH, Park TJ, Korean J. Chem. Eng., 15(1), 9 (1998)
Nam HU, Lee JH, Kim YO, kim YG, Park TJ, Korean J. Chem. Eng., 15(4), 429 (1998)
Park WK, Jung KY, Shin EB, J. KSWQ, 12(4), 409 (1996)