- This is an Open-Access article distributed under the terms of the Creative Commons Attribution Non-Commercial License (http://creativecommons.org/licenses/bync/3.0) which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited.
Copyright © KIChE. All rights reserved.
All issues
Performance and economic analysis of commercial-scale coal-fired power plant with post-combustion CO2 capture
Ji Hyun Lee
No Sang Kwak
In Young Lee
Kyung Ryoung Jang
Dong Woog Lee
Se Gyu Jang
Byung Kook Kim
Jae-Goo Shim†
Future Technology Research Laboratory, KEPCO Research Institute, 65 Munji-ro, Yuseong-gu, Daejon 305-760, Korea
06101658@kepco.co.kr
Korean Journal of Chemical Engineering, May 2015, 32(5), 800-807(8), 10.1007/s11814-014-0267-0
Download PDF
Abstract
A performance and economic analysis of a commercial-scale coal-fired power plant with a post-combustion CO2 capture process in South Korea was performed. Based on the KoSol Process for CO2 Capture (KPCC) developed by the Korea Electric Power Company Research Institute, a power plant cost model coupled with a performance model was developed to evaluate the levelized cost of electricity and the cost of CO2 avoided for power plants with CCS. A techno-economic evaluation result, based on the general guideline suggested by the IEA task force group and key performance data of the pilot-scale CO2 capture test results showed that at the base case, the LCOE of a commercial-scale USC power plant with CCS in South Korea will increase from 47 USD/tCO2 (without CCS) to 68 USD/tCO2 (with CCS), and the cost of CO2 avoided was calculated as 33 USD/tCO2. Comparing this with various studies in other literature showed that the cost of CO2 avoided for power plants in South Korea was much lower than that of the OECD average, which was mainly due to the relatively low capital expenditure (CAPEX) and operating expenditure (OPEX) of a power plant with/without CCS.
References
http://www.tcmda.com/en.
http://www.mhi.co.jp/en/news/story/1209141573.html.
http://sequestration.mit.edu/tools/projects/boundary_dam.html.
MIT, The Future of Coal (2010)
Rao AB, Rubin ES, Environ. Sci. Technol., 36, 4467 (2005)
DOE/NETL, Cost and Performance Baseline for Fossil Energy Plants (2007)
International Energy Agency, Cost and Performance of Carbon Dioxide Capture from Power Generation (2010)
Lee JH, Korea’s New Pilot Plant, Carbon Capture Journal, Jan/Feb (2014)
International Energy Agency, Projected Costs of Generating Electricity (2010)
IEA Greenhouse Gas R&D Programme, Criteria for Technical and Economic Assessment of Plants with Low CO2 Emissions (2009)
Lee JH, Kim JH, Lee IY, Jang KR, Shim JG, Development of Amine Absorbents for Post-combustion Capture, 1st Combustion Capture Conference, May, Abu Dhabi (2011)
Lee JH, Kwak NS, Lee IY, Jang KR, Jang SG, Lee KJ, Han GS, Oh DH, Shim JG, Korean Chem. Eng. Res., 51(2), 267 (2013)
Bolland O, Undrum H, Adv. Environ. Res., 7, 901 (2003)
Lee JH, Kwak NS, Lee IY, Jang KR, Shim JG, Performance Analysis of a 500MWe Coal-fired Power Plant with a Post-Combustion CO2 Capture Process, Proceedings of the Institution of Mechanical Engineers, Part E: Journal of Process Mechanical Engineering (2012)
Lee JH, Kwak NS, Lee IY, Jang KR, Shim JG, Korean Chem. Eng. Res., 50(2), 365 (2012)
http://www.kpx.or.kr.
Korea Development Institute, A Study on Standard Guideline for Pre-feasibility Study, 5th Ed., 182-213 (2008)
Korea Middle East Power Company, Design Data of Boryeong Coal-Fired Power Plant Unit 7 (2011)
http://www.mhi.co.jp/en/news/story/1209141573.html.
http://sequestration.mit.edu/tools/projects/boundary_dam.html.
MIT, The Future of Coal (2010)
Rao AB, Rubin ES, Environ. Sci. Technol., 36, 4467 (2005)
DOE/NETL, Cost and Performance Baseline for Fossil Energy Plants (2007)
International Energy Agency, Cost and Performance of Carbon Dioxide Capture from Power Generation (2010)
Lee JH, Korea’s New Pilot Plant, Carbon Capture Journal, Jan/Feb (2014)
International Energy Agency, Projected Costs of Generating Electricity (2010)
IEA Greenhouse Gas R&D Programme, Criteria for Technical and Economic Assessment of Plants with Low CO2 Emissions (2009)
Lee JH, Kim JH, Lee IY, Jang KR, Shim JG, Development of Amine Absorbents for Post-combustion Capture, 1st Combustion Capture Conference, May, Abu Dhabi (2011)
Lee JH, Kwak NS, Lee IY, Jang KR, Jang SG, Lee KJ, Han GS, Oh DH, Shim JG, Korean Chem. Eng. Res., 51(2), 267 (2013)
Bolland O, Undrum H, Adv. Environ. Res., 7, 901 (2003)
Lee JH, Kwak NS, Lee IY, Jang KR, Shim JG, Performance Analysis of a 500MWe Coal-fired Power Plant with a Post-Combustion CO2 Capture Process, Proceedings of the Institution of Mechanical Engineers, Part E: Journal of Process Mechanical Engineering (2012)
Lee JH, Kwak NS, Lee IY, Jang KR, Shim JG, Korean Chem. Eng. Res., 50(2), 365 (2012)
http://www.kpx.or.kr.
Korea Development Institute, A Study on Standard Guideline for Pre-feasibility Study, 5th Ed., 182-213 (2008)
Korea Middle East Power Company, Design Data of Boryeong Coal-Fired Power Plant Unit 7 (2011)