Articles & Issues
- Language
- korean
- Conflict of Interest
- In relation to this article, we declare that there is no conflict of interest.
- Publication history
-
Received July 16, 2014
Accepted August 17, 2014
- This is an Open-Access article distributed under the terms of the Creative Commons Attribution Non-Commercial License (http://creativecommons.org/licenses/bync/3.0) which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited.
Copyright © KIChE. All rights reserved.
All issues
육/해상 풍력기반 에너지생산 공정 최적 설계 및 경제성 평가
Optimal Design and Economic Evaluation of Energy Supply System from On/Off Shore Wind Farms
인천대학교 에너지화학공학과, 406-772 인천광역시 연수구 아카데미로 119
Department of Energy & Chemical Engineering, Incheon National University, 119 Academy-ro, Yeonsu-gu, Incheon 406-772, Korea
Korean Chemical Engineering Research, April 2015, 53(2), 156-163(8), 10.9713/kcer.2015.53.2.156 Epub 30 March 2015
Download PDF
Abstract
전기자동차 또는 수소를 이용한 연료전지 자동차 등 미래 도로운송부문에서의 주요 에너지 수요는 전기에너지이며, 따라서 풍력 등 신재생에너지 자원을 이용한 에너지 생산 및 공급 전략은 미래의 지속가능한 에너지 시스템 구축에 필수적 고려 요소이다. 신재생에너지 자원 기반의 에너지 생산 시스템은 비단 관련 요소 기술의 개발 및 효율 향상뿐만 아니라 자원 잠재성의 지역적 특성 및 관련 기술들의 최적 설계를 포함한 새로운 공급 전략이 반드시 수반되어야 한다. 본 연구에서는 미래 도로운송부문에서의 주요 에너지 수요 만족을 위한 풍력기반 전력생산 공정 설계 및 최적화를 수행하였으며, 다양한 설계 대안들의 경제성을 평가 및 분석하였다. 최소비용을 목적함수로 설정하고, 수요만족, 에너지 흐름, 최대기술 용량 및 부지사용 제한 등 다양한 제약조건을 포함한 혼합정수선형계획(MILP)모델을 개발하였다. 특히 육상 풍력단지 조성 시 사용 가능한 부지 제한성 및 해상 풍력단지의 높은 자원 잠재성 등 실제 풍력 단지 조성 시 고려되어야 할 다양한 실제적 요소를 제약 조건으로 포함하였다. 제안된 최적화 모델의 효용성을 검증하기 위하여 육/해상 풍력발전단지를 포함한 제주도 전력생산 시스템 설계 문제에 적용하였다. 본 연구에서 개발한 모델을 통하여, 해상 및 육상 풍력단지 간의 비용 효율성 등 제주도에 적합한 최적 공급 시스템을 설계하였으며 경제성을 평가하였다. 또한 사용가능 부지면적에 관한 정책, 필요 부지면적 및 기술의 생산비용 변화 등 주요 비용 관련 변수에 관하여 최종 전력 생산 비용의 민감도 분석을 수행 하였다.
This paper presents a new framework for design and economic evaluation of wind energy-based electricity supply system. We propose a network optimization (mixed-integer linear programming) model to design the underlying energy supply system. In this model we include practical constraints such as land limitations of onshore wind farms and different costs of offshore wind farms to minimize the total annual cost. Based upon the model, we also analyze the sensitivity of the total annual cost on the change of key parameters such as available land for offshore wind farms, required area of a wind turbine and the unit price of wind turbines. We illustrate the applicability of the suggested model by applying to the problem of design of a wind turbines-based electricity supply problem in Jeju. As a result of this study, we identified the major cost-drivers and the regional cost distribution of the proposed system. We also comparatively analyzed the economic performance of on/off shore wind farms in wind energy-based electricity supply system of Jeju.
References
Cho YS, World Peace, (Written in Korean), 5, 101 (2008)
Ku SH, Yoo SH, Renew. Sust. Energ. Rev., 14(8), 2196 (2010)
Cheon SH, The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea, (Written in Korean), 39(1), 6 (2010)
Ryu JH, Korean J. Chem. Eng., 30(1), 27 (2013)
Ilyas M, Lim Y, Han C, Korean J. Chem. Eng., 29(9), 1163 (2012)
Merei G, Berger C, Sauer DU, Sol. Energy, 97, 460 (2013)
Koltsaklis NE, Dagoumas AS, Kopanos GM, Pistikopoulos EN, Georgiadis MC, Appl. Energy, 115, 456 (2014)
Adaramola MS, Krogstad PA, Renew. Energy, 36(8), 2078 (2011)
Watson I, Betts S, Rapaport E, Energy Policy, 41, 782 (2012)
Kusiak A, Song Z, Renew. Energy, 35(3), 685 (2010)
Yeum MG, Social Science Studies, (Written in Korean), 47, 59 (2008)
Kyoung NH, Journal of the Korean Solar Energy Society, (Written in Korean), 3(3), 56 (2004)
Gielen D, IRENA (International Renewable Energy Agency) Working Paper, 1(5) (2012)
Fingersh LJ, Hand M, Laxson AS, “Wind Turbine Design Cost and Scaling Model,” Golden: US National Renewable Energy Laboratory (NREL), Technical Report NREL/TP-500-40566 (2006)
Samorani M, Handbook of Wind Power Systems, Energy Systems, Springer Berlin Heidelberg, 21 (2013)
Barthelmie RJ, Jensen LE, Wind Energy, 13, 573 (2010)
Kim IH, Jeju Development Forum, 37, 18 (2011)
http://english.jeju.go.kr/index.php/contents/AboutJeju/info/jejucity/general.
http://kredc.kier.re.kr/kier/.
Ku SH, Yoo SH, Renew. Sust. Energ. Rev., 14(8), 2196 (2010)
Cheon SH, The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea, (Written in Korean), 39(1), 6 (2010)
Ryu JH, Korean J. Chem. Eng., 30(1), 27 (2013)
Ilyas M, Lim Y, Han C, Korean J. Chem. Eng., 29(9), 1163 (2012)
Merei G, Berger C, Sauer DU, Sol. Energy, 97, 460 (2013)
Koltsaklis NE, Dagoumas AS, Kopanos GM, Pistikopoulos EN, Georgiadis MC, Appl. Energy, 115, 456 (2014)
Adaramola MS, Krogstad PA, Renew. Energy, 36(8), 2078 (2011)
Watson I, Betts S, Rapaport E, Energy Policy, 41, 782 (2012)
Kusiak A, Song Z, Renew. Energy, 35(3), 685 (2010)
Yeum MG, Social Science Studies, (Written in Korean), 47, 59 (2008)
Kyoung NH, Journal of the Korean Solar Energy Society, (Written in Korean), 3(3), 56 (2004)
Gielen D, IRENA (International Renewable Energy Agency) Working Paper, 1(5) (2012)
Fingersh LJ, Hand M, Laxson AS, “Wind Turbine Design Cost and Scaling Model,” Golden: US National Renewable Energy Laboratory (NREL), Technical Report NREL/TP-500-40566 (2006)
Samorani M, Handbook of Wind Power Systems, Energy Systems, Springer Berlin Heidelberg, 21 (2013)
Barthelmie RJ, Jensen LE, Wind Energy, 13, 573 (2010)
Kim IH, Jeju Development Forum, 37, 18 (2011)
http://english.jeju.go.kr/index.php/contents/AboutJeju/info/jejucity/general.
http://kredc.kier.re.kr/kier/.